This document addresses the deliverable D4.2. Advanced concept for security and redispatching cooperation. The document elaborates the concept, algorithm, and mathematical set-up of close to realtime power system security monitoring and remedial action optimization on the regional level. It also provides the method for redispatching cost-sharing, based on the power flow tracing algorithm. The developed concept and methodology explained in this document served as a basis for the development of T-SENTINEL RAO and RDCS software modules.
D4.2. Advanced Concept for Security and Redispatching Cooperation
Previous Post
D3.2 IMC, OTCM and ASM design and development of business processes
Next Post
D5.1 TRINITY monitoring, control and forecasting technology advancements
Recent Posts
- TRINITY New Article on Open Research EU 27 September 2023
- D9.4 Dissemination, Communication and Cooperation activities report (v2) 26 September 2023
- D9.3 Dissemination, Communication and Cooperation activities report (v1) 26 September 2023
- D7.1. Deployment and Evaluation Plan 26 September 2023
- D6.5 T-COORDINATION PLATFORM User Guide v2 26 September 2023
Categories
- deliverables (26)
- Events (5)
- Sin categoría (1)
- Trinity Project (70)